During the 2022-23 school year, PSD contracted with McKinstry Essention LLC, an independent third party, to conduct a thorough analysis of the district’s buildings and systems. This analysis includes creation of a comprehensive facility condition assessment (FCA), a feasibility study specific to the possible installation of solar energy options at schools, a feasibility study specific to the possible installation of air conditioning in schools, and a retrocommissioning study.
The findings of these studies will be shared publicly in PSD Board of Education meetings throughout the 2023-24 school year. PSD will use the information presented in these studies to inform long-term planning associated with the maintenance of our facilities.
McKinstry Studies
Solar Study
Air Conditioning Feasibility Study
- AC Study - Part 1 (Introduction and B-C schools)
- AC Study - Part 2 (D-K schools)
- AC Study - Part 3 (L-O schools)
- AC Study - Part 4 (P-R schools)
- AC Study - Part 5 (S-W schools)
Retro Commissioning Study
- Progress update to the Board of Education, Dec. 12, 2023
Facility Condition Assessment Study
- Facility Condition Assessment Study (FCA)
- McKinstry Engineering Facility Condition Index, Equity Index, and Utility Cost Information
Facilities Condition Assessments by School
Elementary Schools
Middle Schools