Facilities Studies

During the 2022-23 school year, PSD contracted with McKinstry Essention LLC, an independent third party, to conduct a thorough analysis of the district’s buildings and systems. This analysis includes creation of a comprehensive facility condition assessment (FCA), a feasibility study specific to the possible installation of solar energy options at schools, a feasibility study specific to the possible installation of air conditioning in schools, and a retrocommissioning study.

The findings of these studies will be shared publicly in PSD Board of Education meetings throughout the 2023-24 school year. PSD will use the information presented in these studies to inform long-term planning associated with the maintenance of our facilities. 

McKinstry Studies

Solar Study

 

Air Conditioning Feasibility Study

 

Retro Commissioning Study 

  • Progress update to the Board of Education, Dec. 12, 2023

 

Facility Condition Assessment Study

 

Facilities Condition Assessments by School

Contact Information

Please email questions to info@psdschools.org.